The finishing department, at the same time as dyeing the first unit, was first equipped and started working during 1990-1995, which was replaced with new machines during 2016-2018, and the system was reconstructed and renovated, and now it is working with the most up-to-date equipment and machines. Is to work
The completion unit of the second unit was equipped and started from the very beginning from 2009 to 2014, and now, like the first unit, it is operating with the most up-to-date equipment.
Dyeing was first equipped and started working from 1990 to 1995, which was replaced with new machines during 2016-2018, and the system was reconstructed and renovated, and now it is used with the latest equipment and machines.
The dyeing department of the second unit was equipped and started from the very beginning from 2009 to 2014, and now the first unit is operating with the latest equipment.